DraftFor a person to review.Assembled from the daily record on Tue, Nov 24. Check every line and write the next steps before it is sent. Nothing is sent to DDD from this screen.
Monthly progress report
Dwayne Carter, October 2026
- Home
- Palo Verde House
- Service
- Habilitation, Group Home (HAB)
- Status
- Submitted
- Due
- Nov 16, 2026
The sample workspace holds the last 7 days of goal tracking and today's log, so this preview draws on those. In a live workspace the draft covers the whole of October 2026.
Goals1
Checks his blood sugar before breakfast with staff nearby
Met on 7 of 7 recorded days. Target on the plan: daily.
WTFSSMTTrials met: 7 of 7
Health and medication
On the medication log: Metformin 500 mg.
- Daily log, 9:30 am, Lupe FernandezBack late from the lab. Blood sugar 132 before breakfast. Metformin given at 9:25.
- Medication recordWrong time: Metformin 500 mg, the 8:00 am dose, given at 9:25 am. An incident report was opened.
Incidents1
Medication errorTue, Nov 24, 9:25 am· Not yet in the QM Portal
Dwayne's 8:00 am metformin was given at 9:25 am, after a late return from a blood draw. The home's own policy counts a dose more than an hour late as a wrong-time error.
From the daily log
No other log entries name DC in the record.
Next steps
Reviewed by (house manager: Miguel Santos)
Date reviewed